Construction, Project Managements

Poliklinik Komuniti Ayer Keroh, Melaka

Kerja – Kerja Pembaikan Sistem Penyaman Udara, Pembasmian dan Pencegahan Pertumbuhan Kulat (Indoor Air Quality – IAQ)

Scope & system under supervision :

1.Air Conditioning System

  • Air Handling Unit (AHU)
  • Fan Coil Unit (FCU)
  • Cooling Tower
  • Chiller System
  • Chilled Water Pump
  • Chiller Condenser
  • Water Treatment Cooling Tower

2.Building Automation System (BAS)

  • Centralized Control & Monitoring
  • Energy Management System

3.Medical Gas System

  • Oxygen & Vacuum Points
  • Medical Air & Nitrous Oxide
  • Bedhead Trunking Units

4.Lift & Vertical Transportation

  • Passenger Lifts
  • Service/Bed Lifts

5.Fire Fighting System

  • Fire Alarm System
  • Sprinkler & Hose Reel System
  • Fire Hydrant System

6.Private Automatic Branch Exchange (PABX)

  • Telecommunication Infrastructure
  • Intercom & Data Networking

7.Boiler System

  • Hot Water Supply System
  • Steam Generation for Sterilization

 

PROGRESS

 

COMPLETED PROJECT

Leave a Reply

Your email address will not be published. Required fields are marked *